Description
Long Lead Screw Fiber Taper (XQ7170)
The XQ7170 from Shenzhen Oscom Technology Co., Ltd. is a specialized tool designed for the production of high-power optical fiber combiners and unique cone-shaped fiber bundles. This product is engineered to extend the tapering movement length between 200mm and 500mm, making it an ideal choice for mass production environments. Equipped with a specialized optical fiber holder and heater, the XQ7170 ensures stability, reliability, and ease of use, catering to the demands of high-power fiber combiner manufacturing.
One of the standout features of the XQ7170 is its precision in tapering spacing, which ranges from 18mm to 500mm. The unilateral tapering speed can reach up to 1000μm/s, allowing for efficient and precise manufacturing processes. The device also boasts high-resolution movement capabilities, with the fiber holder movement resolution at 0.8μm and the heater's left and right movement resolution at 1.2μm per step. Additionally, the packaging stage movement resolution is set at 2.5μm per step, ensuring meticulous control over the production process.
The XQ7170 is designed to operate within a wavelength range of 800-1700nm or 400-1100nm, with an optical power detection dynamic range of -60 to +3dB. The optical power measurement resolution is finely tuned at 0.01dB, providing accurate readings essential for high-quality fiber production. The device operates optimally in environments with temperatures of 23±3℃ and humidity levels between 50-70% RH, powered by an AC100-240V/50-60Hz/5A supply. With dimensions of 790x525x230mm or 1043x466.5x253mm and a weight of 55Kg, the XQ7170 is a robust and reliable addition to any fiber manufacturing setup.
Long Lead Screw Fiber Taper XQ7170 for Optical Combiners
Specifications
| Tapering Spacing: | 50 - 200 mm, 50 - 600 mm, Other |
|---|---|
| Unilateral Tapering Speed: | 0 – 1000 um/sec |
| Fiber Holder Movement Resolution: | 0.8 um |
| Scanning Resolution: | +/- 1um |
| Detector Type: | InGaAs/Si |
| Weight: | 55Kg |
| Dimensions (L×W×H): | 790x525x230 / 1043×466.5×253mm |
| Operating Power Supply: | AC100-240V/50-60Hz/5A |
| Operating Environment Humidity: | 50-70%RH |
| Operating Environment Temperature: | 23±3℃ |
| Optical Power Measurement Resolution: | 0.01dB |
| Optical Power Detection Dynamic Range: | -60 - +3dB |
| Wavelength Range: | 800-1700/400-1100 nm |
| Tapering Spacing: | 18-200 / 18-500mm |
| Oxygen Flow Range: | 0-100 / 0-300 / 0-500sccm |
| Hydrogen Flow Range: | 0-300 / 0-500 / 0-1000sccm |
| Packaging Stage Movement Resolution: | 2.5μm/step |
| Heater Left & Right Movement Resolution: | 1.2μm/step |
| Fiber Holder Movement Resolution: | 0.8μm |
| Unilateral Tapering Speed: | 0-1000μm/s |
| Heater Scan Width: | ±50-100mm |
Got questions about specs? Use the inquiry form to ask.
Features
- Long Lead Screw Fiber Taper (XQ7170): Designed for high power optical fiber combiners and special cone-shaped fiber bundles, the XQ7170 features an extended tapering movement length of 200-500mm, making it ideal for mass production.
- Stable and Reliable: The XQ7170 offers a stable and reliable performance, ensuring ease of use for manufacturing high power fiber combiners.
- Tapering Spacing: Adjustable tapering spacing ranging from 18-200mm to 18-500mm, providing flexibility for various production needs.
- Heater Scan Width: The heater scan width is adjustable between ±50-100mm, allowing precise control during the tapering process.
- High Precision Movement:
- Fiber Holder Movement Resolution: 0.8μm
- Heater Left & Right Movement Resolution: 1.2μm/step
- Packaging Stage Movement Resolution: 2.5μm/step
- Gas Flow Range:
- Hydrogen Flow Range: 0-300 / 0-500 / 0-1000 sccm
- Oxygen Flow Range: 0-100 / 0-300 / 0-500 sccm
- Detector Type: Equipped with InGaAs/Si detectors for accurate optical measurements.
- Wavelength Range: Supports a wide wavelength range from 800-1700 nm and 400-1100 nm.
- Optical Power Detection:
- Dynamic Range: -60 to +3dB
- Measurement Resolution: 0.01dB
- Operating Environment:
- Temperature: 23±3℃
- Humidity: 50-70% RH
- Power Supply: Operates on AC100-240V/50-60Hz/5A, suitable for various power standards.
- Dimensions and Weight:
- Dimensions: 790x525x230mm / 1043x466.5x253mm
Applications
High Power Optical Fiber Combiners: The XQ7170 is ideal for manufacturing high power (N+1)×1/N×1 optical fiber combiners, ensuring efficient and reliable performance.
Frequently Asked Questions
What is the XQ7170 used for?
What is the tapering movement length of the XQ7170 fiber taper?
What is the wavelength range supported by the XQ7170?
What is the resolution of the optical power measurement for the XQ7170 taper?
What are the operating environment conditions for the XQ7170?
What is the weight of the XQ7170?
What type of detector does the XQ7170 use?
Got more questions? Use the inquiry form to ask the supplier directly.
Similar Products
Your inquiry has been received.
Create an account by adding a password
Why create an account?
- Auto-complete inquiry forms
- View and manage all your past messages
- Save products to your favorites
- Close your account anytime — no hassle